﻿<?xml version="1.0" encoding="utf-8"?>
<rss version="2.0" xmlns:urlManipulator="urn:urlManipulator" xmlns:dateManipulator="urn:dateManipulator">
  <!--This RSS Feed was generated from WSDOT's news web service.  The service may be found here:
http://www.wsdot.wa.gov/public/webservices/newswebservice.asmx

Parameters may be used in the QueryString to narrow the items returned by this RSS feed.

The "count" parameter may be used to limit the number of items returned to that number.

The "office", "area" and "category" parameters may be use to narrow the items returned to
items regarding that office, area or category.

Offices includes Aviation, Eastern, Headquarters, Local Programs, North Central, Northwest,
Olympic, PTR, South Central, and Southwest.

Areas include King, Snohomish, Snoqualmie, Baker, Grays Harbor, Kitsap,
North Olympic Penisula, South Puget Sound, Columbia River Gorge, Lewis, Southwest Coast,
Vancouver, Columbia Basin, Okanogan, Wenatchee, Yakima, Tri-Cities, Colville, Pullman, Spokane,
and Walla Walla.

Categories include Travel Info,  Projects and Issues, and Public Involvement.

Examples:
default.xml?area=South+Puget+Sound
default.xml?area=Spokane&amp;count=5
default.xml?office=Northwest&amp;category=Travel+Info-->
  <channel>
    <title>WSDOT - March</title>
    <link>http://wsdot.gov/News/2011/03/</link>
    <copyright>
          Copyright WSDOT 2008. All rights reserved.
        </copyright>
    <description></description>
    <managingEditor>
          bertraj@wsdot.wa.gov (Jeremy Bertrand)
        </managingEditor>
    <generator>
          Washington State Department of Transportation
        </generator>
    <lastBuildDate>Fri, 24 May 2013 16:52:56 GMT</lastBuildDate>
    <ttl>
          15
        </ttl>
    <image>
      <title>WSDOT - March</title>
      <url>http://wsdot.gov/Public/images/nav/wsdot2g4.gif</url>
      <link>http://wsdot.gov/News/2011/03/</link>
    </image>
    <item>
      <title>State Route 4 near Stella remains closed due to landslide concern</title>
      <pubDate>Wed, 06 Apr 2011 06:33:39 GMT</pubDate>
      <link>http://wsdot.gov/News/2011/03/05_SR4RemainsClosed.htm</link>
      <guid>http://wsdot.gov/News/2011/03/05_SR4RemainsClosed.htm</guid>
      <description>STELLA – State Route 4 will remain closed just west of Germany Creek Road (milepost 50) until early next week while crews stabilize a slope threatening to slide onto the highway.</description>
    </item>
    <item>
      <title>Closures set for SR 112 Lyre River Bridge</title>
      <pubDate>Sat, 02 Apr 2011 03:29:33 GMT</pubDate>
      <link>http://wsdot.gov/News/2011/03/04_01_SR112LyreRiverClosures.htm</link>
      <guid>http://wsdot.gov/News/2011/03/04_01_SR112LyreRiverClosures.htm</guid>
      <description>Closures set for SR 112 Lyre River Bridge</description>
    </item>
    <item>
      <title>WSDOT accepting applications for next round of airport aid grants</title>
      <pubDate>Fri, 01 Apr 2011 02:35:50 GMT</pubDate>
      <link>http://wsdot.gov/News/2011/03/NextRoundAirportGrants.htm</link>
      <guid>http://wsdot.gov/News/2011/03/NextRoundAirportGrants.htm</guid>
      <description>ARLINGTON – Airport sponsors interested in receiving state funding for airport improvements can now apply for the first round of WSDOT Airport Aid Grants for the 2011-2013 biennium. Applications must be submitted no later than 5:00 pm on May 6, 2011. Applicants are encouraged to submit application packets before the deadline. Eligible projects must begin after July 1, 2011.</description>
    </item>
    <item>
      <title>Celebrate Work Zone Awareness week by going orange for work zone safety</title>
      <pubDate>Fri, 01 Apr 2011 00:07:23 GMT</pubDate>
      <link>http://wsdot.gov/News/2011/03/31_workzonesafety2011.htm</link>
      <guid>http://wsdot.gov/News/2011/03/31_workzonesafety2011.htm</guid>
      <description>In recognition of the men and women who work mere feet from traffic, the Washington State Department of Transportation (WSDOT) along with state and national groups will go orange for work zone safety April 4 through 9 to celebrate National Work Zone Awareness Week.</description>
    </item>
    <item>
      <title>New report highlights Washington’s Recovery Act transportation investments</title>
      <pubDate>Thu, 31 Mar 2011 22:40:18 GMT</pubDate>
      <link>http://wsdot.gov/News/2011/03/WSDOTReportsonRecoveryActInvestment.htm</link>
      <guid>http://wsdot.gov/News/2011/03/WSDOTReportsonRecoveryActInvestment.htm</guid>
      <description>New report highlights Washington’s Recovery Act transportation investments</description>
    </item>
    <item>
      <title>Final cleanup for SR 411 landslide begins April 4</title>
      <pubDate>Thu, 31 Mar 2011 05:49:40 GMT</pubDate>
      <link>http://wsdot.gov/News/2011/03/30_SR411CleanupStartsApril4.htm</link>
      <guid>http://wsdot.gov/News/2011/03/30_SR411CleanupStartsApril4.htm</guid>
      <description>KELSO – Drivers on State Route 411 near Hazel Dell Road should expect daytime delays starting Monday, April 4, while crews clear landslide debris from the slope above the highway.</description>
    </item>
    <item>
      <title>No Fooling: I-405 in Bellevue to close this Friday, April 1 at 11 p.m.</title>
      <pubDate>Thu, 31 Mar 2011 01:24:05 GMT</pubDate>
      <link>http://wsdot.gov/News/2011/03/30_I405inBelleuveToCloseThisWeekend.htm</link>
      <guid>http://wsdot.gov/News/2011/03/30_I405inBelleuveToCloseThisWeekend.htm</guid>
      <description>Busy I-405 between N.E. Eight Street and SR 520 in Bellevue will close for 53 hours this weekend while crews remove the old N.E. 12th Street Bridge. The full closure will begin at 11 p.m., Friday, April 1 and end by 4 a.m., Monday, April 4. To help prevent region-wide gridlock, drivers should delay discretionary trips, take alternate routes, and plan for delays throughout the Puget Sound area.</description>
    </item>
    <item>
      <title>Clearing the North Cascades Highway starts April 11</title>
      <pubDate>Thu, 31 Mar 2011 01:02:06 GMT</pubDate>
      <link>http://wsdot.gov/News/2011/03/30SR20ReopeningStarts411.htm</link>
      <guid>http://wsdot.gov/News/2011/03/30SR20ReopeningStarts411.htm</guid>
      <description>WSDOT plans to begin clearing State Route 20, The North Cascades Highway, on Monday, April 11.</description>
    </item>
    <item>
      <title>WSDOT’s bridge program scores high nationally</title>
      <pubDate>Thu, 31 Mar 2011 00:03:23 GMT</pubDate>
      <link>http://wsdot.gov/News/2011/03/30_2010bridgereport.htm</link>
      <guid>http://wsdot.gov/News/2011/03/30_2010bridgereport.htm</guid>
      <description>Washington state’s bridge maintenance and preservation program ranked high in a report released today by Transportation for America, a broad coalition of organizations promoting national transportation reform.</description>
    </item>
    <item>
      <title>I-90 paving work starts April 11 in Adams County</title>
      <pubDate>Wed, 30 Mar 2011 21:59:36 GMT</pubDate>
      <link>http://wsdot.gov/News/2011/03/30_i90ritztokiopaver.htm</link>
      <guid>http://wsdot.gov/News/2011/03/30_i90ritztokiopaver.htm</guid>
      <description>Crews begin paving on I-90 between Ritzville and Tokio in Adams County on April 11 to smooth the roadway for drivers and increase its lifespan.</description>
    </item>
    <item>
      <title>New tool highlights best times to catch a ferry</title>
      <pubDate>Wed, 30 Mar 2011 01:45:04 GMT</pubDate>
      <link>http://wsdot.gov/News/2011/03/tools_032911.htm</link>
      <guid>http://wsdot.gov/News/2011/03/tools_032911.htm</guid>
      <description>New tool highlights best times to catch a ferry</description>
    </item>
    <item>
      <title>Work to rebuild SR 28/US 2/97/Eastmont Ave. intersection begins this week</title>
      <pubDate>Tue, 29 Mar 2011 06:16:36 GMT</pubDate>
      <link>http://wsdot.gov/News/2011/03/28SR28US2_97IntImprovements.htm</link>
      <guid>http://wsdot.gov/News/2011/03/28SR28US2_97IntImprovements.htm</guid>
      <description>A new intersection allowing commuters direct access to residential East Wenatchee at the end of the Odabashian Bridge north of town will be completed over the next two months.</description>
    </item>
    <item>
      <title>Construction resumes on I-90 east of Snoqualmie Pass</title>
      <pubDate>Tue, 29 Mar 2011 04:05:33 GMT</pubDate>
      <link>http://wsdot.gov/News/2011/03/28_I90constructionsnoqulmiepasseast.htm</link>
      <guid>http://wsdot.gov/News/2011/03/28_I90constructionsnoqulmiepasseast.htm</guid>
      <description>Major highway improvements on Interstate 90 east of Snoqualmie pass are kicking off again now that winter weather has calmed down.</description>
    </item>
    <item>
      <title>Mukilteo terminal work completed ahead of schedule</title>
      <pubDate>Mon, 28 Mar 2011 23:19:16 GMT</pubDate>
      <link>http://wsdot.gov/News/2011/03/Muk_032811.htm</link>
      <guid>http://wsdot.gov/News/2011/03/Muk_032811.htm</guid>
      <description>Mukilteo terminal work completed ahead of schedule</description>
    </item>
    <item>
      <title>Paving work on southbound US 395 in Adams County starts April 4</title>
      <pubDate>Mon, 28 Mar 2011 22:12:07 GMT</pubDate>
      <link>http://wsdot.gov/News/2011/03/28_us395leerd.htm</link>
      <guid>http://wsdot.gov/News/2011/03/28_us395leerd.htm</guid>
      <description>Crews begin repaving 22 miles of US 395 between Lee Road and Ritzville in Adams County on April 4 to help smooth the road for drivers and increase the lifespan of the roadway.</description>
    </item>
    <item>
      <title>Studded tire deadline extended one week</title>
      <pubDate>Sat, 26 Mar 2011 03:02:35 GMT</pubDate>
      <link>http://wsdot.gov/News/2011/03/25_studded_tires_extend.htm</link>
      <guid>http://wsdot.gov/News/2011/03/25_studded_tires_extend.htm</guid>
      <description>The studded tire deadline has been extended one week. Drivers must now remove their studded tires by the end of the day Thursday, April 7.</description>
    </item>
    <item>
      <title>No new cracks or damage found during inspection of SR 99 Alaskan Way Viaduct</title>
      <pubDate>Sat, 26 Mar 2011 02:42:55 GMT</pubDate>
      <link>http://wsdot.gov/News/2011/03/25_awvinspectionresults.htm</link>
      <guid>http://wsdot.gov/News/2011/03/25_awvinspectionresults.htm</guid>
      <description>New survey data reveals no new settlement or structural damage on the State Route 99 Alaskan Way Viaduct.</description>
    </item>
    <item>
      <title>Smoother interstate ramps on tap for Clark County</title>
      <pubDate>Fri, 25 Mar 2011 04:51:02 GMT</pubDate>
      <link>http://wsdot.gov/News/2011/03/24_SmootherRampsClarkCounty.htm</link>
      <guid>http://wsdot.gov/News/2011/03/24_SmootherRampsClarkCounty.htm</guid>
      <description>VANCOUVER – Say goodbye to the bumps and hello to smoother on- and off-ramps in Clark County. Starting next week, crews will repave ramps at seven interchanges along Interstate 205 (I-205) and Interstate 5 (I-5).</description>
    </item>
    <item>
      <title>Plan ahead for busy weekend of construction closures around Puget Sound</title>
      <pubDate>Fri, 25 Mar 2011 02:24:12 GMT</pubDate>
      <link>http://wsdot.gov/News/2011/03/24_BusyWeekend.htm</link>
      <guid>http://wsdot.gov/News/2011/03/24_BusyWeekend.htm</guid>
      <description>SHORELINE – A slew of closures and construction work are planned throughout the Puget Sound region this weekend.</description>
    </item>
    <item>
      <title>Paving resumes on Division Street in Spokane</title>
      <pubDate>Thu, 24 Mar 2011 22:22:13 GMT</pubDate>
      <link>http://wsdot.gov/News/2011/03/24_us2divstreetpaver.htm</link>
      <guid>http://wsdot.gov/News/2011/03/24_us2divstreetpaver.htm</guid>
      <description>Warmer weather has crews from the Washington State Department of Transportation (WSDOT) and Inland Asphalt Company returning to work to finish repaving Spokane’s busiest north-south arterial — Division Street. Work will restart on Monday, April 4.</description>
    </item>
    <item>
      <title>Spring sailing schedule for ferries begins March 27</title>
      <pubDate>Wed, 23 Mar 2011 06:38:30 GMT</pubDate>
      <link>http://wsdot.gov/News/2011/03/22_SpringSchedule.htm</link>
      <guid>http://wsdot.gov/News/2011/03/22_SpringSchedule.htm</guid>
      <description>The spring sailing schedule for WSF begins Sunday, March 27. More sailings will be added to popular routes and the international route between Anacortes and Sidney, B.C., starts again.</description>
    </item>
    <item>
      <title>Construction starts on safety project in Burbank</title>
      <pubDate>Wed, 23 Mar 2011 06:21:00 GMT</pubDate>
      <link>http://wsdot.gov/News/2011/03/Construction_starts_on_safety_project_in_Burbank.htm</link>
      <guid>http://wsdot.gov/News/2011/03/Construction_starts_on_safety_project_in_Burbank.htm</guid>
      <description>Construction starts on US 12 safety project in Burbank</description>
    </item>
    <item>
      <title>WSDOT names new public transportation director</title>
      <pubDate>Wed, 23 Mar 2011 05:55:59 GMT</pubDate>
      <link>http://wsdot.gov/News/2011/03/New_PT_Director.htm</link>
      <guid>http://wsdot.gov/News/2011/03/New_PT_Director.htm</guid>
      <description>A veteran of bringing transportation choices to Washington, Brian Lagerberg was named director of the Public Transportation Division at WSDOT.</description>
    </item>
    <item>
      <title>N.E. 12th Street Bridge opens in Bellevue</title>
      <pubDate>Wed, 23 Mar 2011 01:10:00 GMT</pubDate>
      <link>http://wsdot.gov/News/2011/03/NewNE12thStreetBridgeOpens.htm</link>
      <guid>http://wsdot.gov/News/2011/03/NewNE12thStreetBridgeOpens.htm</guid>
      <description>Crews opened the first half of the new N.E. 12th Street Bridge to traffic early this morning, marking a construction milestone that will allow them to tear down the old bridge the first weekend in April.</description>
    </item>
    <item>
      <title>Crews to smooth I-90 west of downtown Spokane</title>
      <pubDate>Tue, 22 Mar 2011 23:32:36 GMT</pubDate>
      <link>http://wsdot.gov/News/2011/03/i90sunsethill.htm</link>
      <guid>http://wsdot.gov/News/2011/03/i90sunsethill.htm</guid>
      <description>Crews to smooth I-90 west of downtown Spokane.</description>
    </item>
    <item>
      <title>WSDOT seeks comments on DBE contracting goals</title>
      <pubDate>Tue, 22 Mar 2011 05:08:22 GMT</pubDate>
      <link>http://wsdot.gov/News/2011/03/DBEcontractingGoals.htm</link>
      <guid>http://wsdot.gov/News/2011/03/DBEcontractingGoals.htm</guid>
      <description>WSDOT seeks comments on DBE contracting goals</description>
    </item>
    <item>
      <title>Crews to install fish-friendly culvert on SR 548 near Blaine</title>
      <pubDate>Tue, 22 Mar 2011 02:55:01 GMT</pubDate>
      <link>http://wsdot.gov/News/2011/03/21_sr548installnewculvert.htm</link>
      <guid>http://wsdot.gov/News/2011/03/21_sr548installnewculvert.htm</guid>
      <description>When Terrell Creek is flowing swiftly, the undersized culvert beneath State Route 548 pumps water like a fire hose. And when the creek is calm, the culvert sits several feet out of the water. Either way, it blocks fish trying to reach spawning grounds.</description>
    </item>
    <item>
      <title>Weekend-long I-5 lane closures coming to Lakewood</title>
      <pubDate>Fri, 18 Mar 2011 23:04:53 GMT</pubDate>
      <link>http://wsdot.gov/News/2011/03/18_5_wkendclosurescoming.htm</link>
      <guid>http://wsdot.gov/News/2011/03/18_5_wkendclosurescoming.htm</guid>
      <description>Mid-April WSDOT crews begin preservation work on the I-5 Clover Creek Bridge in Lakewood.</description>
    </item>
    <item>
      <title>Open house to kick off SR 520 Eastside construction</title>
      <pubDate>Fri, 18 Mar 2011 03:21:11 GMT</pubDate>
      <link>http://wsdot.gov/News/2011/03/17_SR520EastsideConstructionOpenHouse.htm</link>
      <guid>http://wsdot.gov/News/2011/03/17_SR520EastsideConstructionOpenHouse.htm</guid>
      <description>BELLEVUE – Construction starts next month on major State Route 520 highway improvements on the Eastside, and an open house is planned March 23 so commuters and neighbors can learn what to expect during the work.</description>
    </item>
    <item>
      <title>Public invited to provide comment on draft communication plan for aviation economic study</title>
      <pubDate>Fri, 18 Mar 2011 02:21:59 GMT</pubDate>
      <link>http://wsdot.gov/News/2011/03/AEISCommPlan.htm</link>
      <guid>http://wsdot.gov/News/2011/03/AEISCommPlan.htm</guid>
      <description>The public is invited to provide feedback on the draft communication plan for the statewide Aviation Economic Impact Study. The 15 day public comment period extends from March 18 to April 7.</description>
    </item>
    <item>
      <title>Painting crews return to the Lewis and Clark Bridge March 21</title>
      <pubDate>Thu, 17 Mar 2011 23:13:30 GMT</pubDate>
      <link>http://wsdot.gov/News/2011/03/17_SR433PaintingCrewsReturn.htm</link>
      <guid>http://wsdot.gov/News/2011/03/17_SR433PaintingCrewsReturn.htm</guid>
      <description>LONGVIEW – Work on a weather-dependent painting project to preserve the Lewis and Clark Bridge on State Route 433 resumes Monday, March 21, after winter weather shut down work activities for nearly four months.</description>
    </item>
    <item>
      <title>I-90 widening in the Spokane Valley starts on March 28</title>
      <pubDate>Wed, 16 Mar 2011 22:04:36 GMT</pubDate>
      <link>http://wsdot.gov/News/2011/03/i90sullivanbarkerwiden.htm</link>
      <guid>http://wsdot.gov/News/2011/03/i90sullivanbarkerwiden.htm</guid>
      <description>Interstate 90 widening between Sullivan and Barker in the Spokane Valley.</description>
    </item>
    <item>
      <title>Report complete on US 101 widening project in Sequim</title>
      <pubDate>Wed, 16 Mar 2011 00:15:53 GMT</pubDate>
      <link>http://wsdot.gov/News/2011/03/15_101_EAOpenHouse.htm</link>
      <guid>http://wsdot.gov/News/2011/03/15_101_EAOpenHouse.htm</guid>
      <description>WSDOT hosts open house for US 101 Kitchen-Dick project Thursday, Mar. 17.</description>
    </item>
    <item>
      <title>Semiannual inspection closes SR 99 Alaskan Way Viaduct this weekend</title>
      <pubDate>Tue, 15 Mar 2011 22:44:27 GMT</pubDate>
      <link>http://wsdot.gov/News/2011/03/15_viaductinspection.htm</link>
      <guid>http://wsdot.gov/News/2011/03/15_viaductinspection.htm</guid>
      <description>Crews will close the State Route 99 Alaskan Way Viaduct this weekend for its semiannual inspection and to test a new system that automatically closes the viaduct when sensors detect an earthquake.</description>
    </item>
    <item>
      <title>Northbound SR 99 on-ramp at stadiums opens in time for Sounders, Mariners season home openers</title>
      <pubDate>Sat, 12 Mar 2011 04:20:02 GMT</pubDate>
      <link>http://wsdot.gov/News/2011/03/11_Northbound-99-ramp.htm</link>
      <guid>http://wsdot.gov/News/2011/03/11_Northbound-99-ramp.htm</guid>
      <description>Construction crews will open the northbound SR 99 on-ramp from S. Royal Brougham Way at 7 tonight, just days before the Sounders FC regular season home opener.
Crews demolished the SR 99 on-ramp from First Avenue S. on Feb. 18. They spent three weeks rebuilding the ramp to connect it to S. Royal Brougham Way between First Avenue S. and Alaskan Way S.</description>
    </item>
    <item>
      <title>SR 9 improvements delayed until next year</title>
      <pubDate>Sat, 12 Mar 2011 04:19:28 GMT</pubDate>
      <link>http://wsdot.gov/News/2011/03/11_sr9improvementsdelayed.htm</link>
      <guid>http://wsdot.gov/News/2011/03/11_sr9improvementsdelayed.htm</guid>
      <description>A roundabout scheduled for construction this summer east of Arlington at the intersection of State Route 9 and State Route 531 has been delayed until next year.</description>
    </item>
    <item>
      <title>Crews inspect Deception Pass bridges</title>
      <pubDate>Thu, 10 Mar 2011 00:41:06 GMT</pubDate>
      <link>http://wsdot.gov/News/2011/03/09_sr20deceptionpassinspections.htm</link>
      <guid>http://wsdot.gov/News/2011/03/09_sr20deceptionpassinspections.htm</guid>
      <description>Though the Deception Pass bridges boast some of the most majestic views in the state, crews won’t be admiring the views next week when they’re hanging off the sides of the 180-foot-tall bridges.</description>
    </item>
    <item>
      <title>SR 9 safety improvements resume near Lake Stevens</title>
      <pubDate>Wed, 09 Mar 2011 03:16:52 GMT</pubDate>
      <link>http://wsdot.gov/News/2011/03/08_sr9safetyworkresumes.htm</link>
      <guid>http://wsdot.gov/News/2011/03/08_sr9safetyworkresumes.htm</guid>
      <description>Commuters and residents near Lake Stevens will see crews back at work making SR 9 safer and reducing congestion between Lundeen Parkway and SR 92.</description>
    </item>
    <item>
      <title>Building roundabouts on Mount Baker Highway this year</title>
      <pubDate>Wed, 09 Mar 2011 02:15:25 GMT</pubDate>
      <link>http://wsdot.gov/News/2011/03/08_sr542roundaboutsbuiltthisyear.htm</link>
      <guid>http://wsdot.gov/News/2011/03/08_sr542roundaboutsbuiltthisyear.htm</guid>
      <description>Smoother traffic along Mount Baker Highway is just around the bend. Two new roundabouts will ease the flow at intersections near Deming.</description>
    </item>
    <item>
      <title>INRIX report: WSDOT’s Moving Washington programs keeping traffic moving</title>
      <pubDate>Wed, 09 Mar 2011 01:01:00 GMT</pubDate>
      <link>http://wsdot.gov/News/2011/03/08_INRIX_report_WSDOT_traffic.htm</link>
      <guid>http://wsdot.gov/News/2011/03/08_INRIX_report_WSDOT_traffic.htm</guid>
      <description>The 2010 National Traffic Scorecard, an annual congestion report published today by INRIX Corporation, shows Seattle as the country’s only major urban area that did not see congestion get worse last year.</description>
    </item>
    <item>
      <title>Amtrak Cascades hoping to cash in with new lottery ticket partnership</title>
      <pubDate>Tue, 08 Mar 2011 21:37:00 GMT</pubDate>
      <link>http://wsdot.gov/News/2011/03/030811_AmtrakCascadesLottery.htm</link>
      <guid>http://wsdot.gov/News/2011/03/030811_AmtrakCascadesLottery.htm</guid>
      <description>Amtrak Cascades partners with Washington's Lottery to launch new Cash Train Scratch ticket.</description>
    </item>
    <item>
      <title>Bridge fence project narrows the gaps over I-5 in Olympia</title>
      <pubDate>Sat, 05 Mar 2011 05:45:24 GMT</pubDate>
      <link>http://wsdot.gov/News/2011/03/03_04_I5CapitolBridgeProjectbegins.htm</link>
      <guid>http://wsdot.gov/News/2011/03/03_04_I5CapitolBridgeProjectbegins.htm</guid>
      <description>Bridge fence project narrows the gaps over I-5 in Olympia</description>
    </item>
    <item>
      <title>Project to repair US 2 trestle will begin this spring</title>
      <pubDate>Sat, 05 Mar 2011 01:08:51 GMT</pubDate>
      <link>http://wsdot.gov/News/2011/03/4_US2TrestleRepairs.htm</link>
      <guid>http://wsdot.gov/News/2011/03/4_US2TrestleRepairs.htm</guid>
      <description>This spring, crews will begin a project to repair and reinforce more than 844 of the girders that support the westbound lanes.</description>
    </item>
    <item>
      <title>Construction season begins with detours near Wenatchee</title>
      <pubDate>Fri, 04 Mar 2011 07:21:00 GMT</pubDate>
      <link>http://wsdot.gov/News/2011/03/0397AConstructionSeasonBegins.htm</link>
      <guid>http://wsdot.gov/News/2011/03/0397AConstructionSeasonBegins.htm</guid>
      <description>The highway construction season in North Central Washington gets under way with road closures and detours.</description>
    </item>
    <item>
      <title>WSDOT and customer service vendor working to improve Good To Go! customer experience</title>
      <pubDate>Fri, 04 Mar 2011 04:50:52 GMT</pubDate>
      <link>http://wsdot.gov/News/2011/03/3_gtgCustomerServiceImprovements.htm</link>
      <guid>http://wsdot.gov/News/2011/03/3_gtgCustomerServiceImprovements.htm</guid>
      <description>WSDOT is working to improve the Good To Go! customer experience.</description>
    </item>
    <item>
      <title>Tunnel construction to delay drivers on SR 14 near Cape Horn</title>
      <pubDate>Fri, 04 Mar 2011 03:05:42 GMT</pubDate>
      <link>http://wsdot.gov/News/2011/03/03_SR14TunnelConstruction.htm</link>
      <guid>http://wsdot.gov/News/2011/03/03_SR14TunnelConstruction.htm</guid>
      <description>WASHOUGAL – Drivers on State Route 14 between Cape Horn and Salmon Falls Road should prepare for around-the-clock lane closures and delays beginning Monday, March 7, as crews begin construction on new pedestrian tunnels beneath the highway.</description>
    </item>
    <item>
      <title>WSDOT announces proposal to preserve historic Seattle building in Pioneer Square</title>
      <pubDate>Thu, 03 Mar 2011 06:46:32 GMT</pubDate>
      <link>http://wsdot.gov/News/2011/03/2-pioneersquare.htm</link>
      <guid>http://wsdot.gov/News/2011/03/2-pioneersquare.htm</guid>
      <description>Historic preservation groups were notified today about a proposal to preserve the 619 Western Building in Pioneer Square during construction of the proposed SR 99 bored tunnel. The Washington State Department of Transportation (WSDOT) developed the proposal to stabilize and shore the building sufficiently to minimize potential damage during construction. The Western Building is in poor structural condition and sits on unconsolidated fill that without protective measures could settle during tunne</description>
    </item>
  </channel>
</rss>